Galvanized Supply Line Replacement in Auburn Single-Families
Auburn's 1900s and 1910s single-family homes were almost universally plumbed in galvanized steel for both the hot and cold supply, and the interior of those pipes has been scaling shut for over a century. The visible symptom is pressure — full pressure at one fixture and a trickle at the next floor up. Auburn repipes to PEX typically take 2-3 days for a 1,500-2,000 sq ft house, and we route through closets and chases so wall opening is minimal. We test pressure at every fixture before we leave.
